With the official launch of LEED for Homes in February of 2008, we were already consulting on several custom LEED-H pilot projects. We provide LEED-H “Representative” services through the LEED-H “Provider” in California, Davis Energy Group. The Representative is similar to having a LEED consultant on a LEED-NC project, except there is a strict limitation on the Representative’s time, since they are contracted through the Provider in an effort to keep certification costs down.  The Provider is contracted by USGBC to act as the local agent for USGBC, since there is such a large volume of residential projects compared with other LEED programs. The program works fairly well, as long as the architect and contractor are savvy with green building, energy, water and indoor air quality.

Our most successful projects hired us independently to provide additional LEED-H consulting, which eased the burden on the design team and contractor. Some owners and architects initially expect LEED-H fees paid to USGBC to cover the consulting portion, which Davis Energy describes as the “how you do it” scope of work. Fees charged by USGBC, including the Representatives’ time, actually only cover the “did you do it?” scope of work. Davis Energy encourages owners and design teams to hire the Representatives independently, if the design team needs support in meeting prerequisites and credits. The most successful projects either pay someone in-house or hire a LEED consultant to coordinate, update, and administrate the LEED-H process. LEED-H requires numerous documents in addition to the LEED-H checklist, such as the Thermal Bypass Checklist, Accountability Forms, Durability Evaluation, and Rater Checklist. Keeping track of all these documents and preparing them at the appropriate time is challenging and confusing, particularly given the ongoing evolution of the LEED-H program. It is also important to keep in mind that the design team, owner, and contractor are also required to produce supporting documentation for each credit. Many people have the false impression that a LEED consultant prepares everyone’s documentation for them.

The main areas of discussion around LEED for Homes are hard and soft costs, prerequisites and credits. I’ve heard people say that only the top 15% of homes are targeted for LEED-H. This may be due to design team experience, quality of construction, potential added costs, and sheer will of the owner and architect. We had 5 LEED-H Platinum Homes certified last year where the added hard costs were very low; in the range of 2%-5% with a per square foot cost under $250. Those five homes are also net-zero energy homes. We also have the other spectrum of larger “green” custom homes that do not fit into Sarah Susanka’s “Not So Big House” concept; I’ll call them “Case Study Green Homes.” Added costs for LEED on these case study projects may actually be a smaller fraction of the overall costs, since volume and fancy finishes typically outweigh green elements and systems. Our hope is that working together, we can streamline the LEED-H program with the goal of added hard costs under 2% and added soft costs for the entire team under $10,000. It would be interesting to hear what others have to say about added soft costs and program efficiency improvements.

demaria-exterior112low-res

LEED-H Silver house in Palm Springs by Solterra Development

Michael Heacock + Associates is a LEED consulting firm with offices in San Francisco and Santa Barbara.  Their work includes schools, commercial, public, institutional and residential projects.